CRITICAL PATH FOR 2026

 

 

THE “YES, YOU CAN!” COURSE CONTAINS:

SIX 1-HOUR WEEKLY ONLINE MEETINGS WITH NURIT

5 LECTURE VIDEOS BY GABOR:

“From Fixing Damages to Accessing Perfection”

“Freed Attention – The Essence of Empowerment”

“You Are the Boss”

“Recipe for a Good Life”

“Leaping Unto a Higher Platform”

 PLUS 5 PRACTICE VIDEOS

The world is changing and will never be as we knew it. We are being compelled and pulled into a new paradigm. You must all be feeling this and that is why you are here. Some may dread this change since we have been programmed to fear and reject an “unknown” and to trust and rely only on the “familiar”.

Humanity has always been able to adapt to new situations and environments. However, at this time in our personal and collective evolution adaptation may no longer work. We have always been able to turn to spirituality to find a sense of comfort, but so many are now finding that mainstream and new age spirituality does not offer lasting peace.

The “Yes, You Can!” series is not “about” awakening, but rather actual permanent awakening.

It will make a major impact on your life since it is not a philosophy filled with spiritual concepts. It is rather a direct entry into the new paradigm and gaining the ability to operate in it.

We won’t be talking about the future… we will step right into the future!

So, what will you walk away with?

  • You will be COMPLETELY FREE of imposed programming and propaganda
  • You will REGAIN YOUR POWER as we put an end to the mystery that has hijacked your attention and stole your sovereignty.
  • You will be fully prepared and equipped for the NEW PARADIGM
  • You will find the strength and skill to ENTER THE NEW ERA WITH AGILITY, DEXTERITY, EASE AND COMFORT
  • You will be able to LOOK AT THE WORLD DIFFERENTLY
  • You may have heard that AWAKENING IS BEYOND THE MIND – TRUE! During this course you will ACTUALLY EXPERIENCE this, and you will have THE TOOLS TO SUSTAIN IT
  • You will GAIN UNBLEMISHED THINKING and know how to SET GOALS WITH CLEAR INTENTION
  • You will get in touch with THAT PART OF YOU THAT HAS NEVER BEEN DAMAGED
  • You will be outfitted with A NEW SKILL SET THAT IS NECESSARY FOR THRIVING IN THE FUTURE

To register for the "Yes, You Can!" course, please write to Nurit at info@gaborharsanyi.com and fill out this form. Once there is enough interest we will contact you with the next course start date.

We found that for best results it is better to work with smaller groups in which each participant can receive individually attention and personalized instruction.  So, to ensure success, we limit this course to 4-6 participants.

WHAT NEXT???

Once you have completed the "Yes, You Can!" course successfully, you will be eligible to join the 

THE ADVANCED R.O.A.R INTEGRATION GROUP

R.R.R.O.A.R – RE-DISCOVERY, RE-AFFIRMATION, RE-ENFORCEMENT OF ANGULAR REALITY

This past year Gabor’s work has reached a new milestone, an entirely new level of depth, understanding and manifestation skills.

We have been receiving beautiful testimonials from those who are mastering being activated and living consciously throughout the day (soon to be shared on this website).

They are creating magical synchronistic events daily such as -

- repaired family relationships

- finding one’s soulmate

- clearer communications with co-workers

- ability to let go with ease

- enhanced leadership skills

- successful negotiations in business deals

- improved public speaking skills and much more.

Thus, our focus and direction for 2026 will be:

Group navigation sessions to develop and refine skills for living in the new paradigm, which we call Angular Reality.

Currently this group meets several times a week to practice navigating through the angular reality that is awakened and activated within the body, which is a replica of the universe.

By accessing specific centers in the body through recently re-discovered specialized skills, we are converging with the universe. Thus, universal secrets are revealed to us via the intelligence that runs the body and the entire universe.

Who can attend?

Anyone who has taken the “Yes, You Can!” course with Nurit

If that's you, write to info@gaborharsanyi.com to apply!

JOINING THE R.O.A.R INTEGRATION GROUP

The R.O.A.R sessions are designed to deepen the understanding, to integrate and to practice what has been learned.

This is an integral part of securing permanency in the elevated platform of the new paradigm. 

These interactive sessions with Gabor will ensure that the mind will not be able to run off with new concepts that will once again entrap us in the snare of conceptualization.

This is the kind of support that is needed to protect our new found freedom and to remain untouched by programming and mental manipulation.

 

 

PARTICIPANTS' FEEDBACK

 

Other Testimonials:

- "Thanks for these wonderful videos filled with gems as always-I have absolutely loved the course! Have been watching course videos again and again especially lectures 3 and 4 and practice 4, so good, every re-watch seems to bring new clarification, kind of seeps in, clicking in place, in a way that the contrast mind can’t explain. The Action Plan…video is fantastic! Really and truly helped drop the need and/or desire the habit to analyze or repair anything coming from the contrast mind, just NOT necessary. Like ok got it! Done with that. 

- "I am so thrilled to have found you both on this path – you both have touched my heart deeply and I really thank you for these courses!!!!  I am very committed to working with you on this journey and appreciate your guidance! As with the first session, the last session was very powerful, sincere and deeply moving encounter that reverberates still! I feel as if there is space opening, less constriction within (if this makes any sense).  Gabor, your sincerity, deep authenticity and love in speaking creates such a safe place to open to and relax into. Your pointing gets directly to the point and shows us the possibility of living from this level.

The last session has brought a deepening feeling to going into the inner body. Still contemplating and listening to the difference between mind calm and Being calm and the ability to ‘be’ and shift context and not content. This is new for me and it feels so important.  There is also a beautiful synergy with your book and it works well to reinforce what you’re pointing to in our classes.

Also – WOW - Gabor’s Momentary Optimum ‘MO’ has opened a new freedom and lightening of living and seeing the world. By allowing each moment to be designed and responded to by Love, we can simply relax, go into Being and let events unfold. Gabor has given us a key that allows us to be okay with doing the best that we can in each given moment - even when our mind says we could have down better.  We know that the key is to keep on going into Being/inner body, relaxing, embracing what comes, continuing to do our best with this moment and this moment and so on and so on.  Each momentary optimum is as it is and as we continue with inviting our practice into our everyday life we will continue to open and go deeper into Love.

Deeply appreciated is Nurit’s suggestion of using the Excel format for regular and irregular activities and especially the catalyst triggers.  I have made a detailed list and combine this with setting intentions & the "eye blink" exercise that Gabor demonstrated.  I also continue to stop throughout the day, just to BE.  It is amazing how beautifully this works in bringing the practice more easily into daily activities.  It has also opened flashes of where I’ve experienced spontaneous connections even with strangers in stores – it shows such a possibility of a new life reality!"

- “I love the visuals and find it very useful to listen to the class again and be able to make notes, just like I do with my individual sessions. The charts for recording when and during what activity you practice are really smart. I found it motivating to remember all the ways and times I can practice. It seems like I sometimes get complacent about practicing, my mind’s attitude being “We got this. Not to worry. We’re good.”

- “The metaphor about the flea trying to characterize an elephant is brilliant. And the answer Gabor gave to Maria about when we activate the context reality, we are still able to think like before, except that the
thinking is now free of fear—that was so clear and simply put. These two together reinforced for me the trap of staying with any one explanation for too long—how words will never accurately describe the experience and are less useful for describing future experiences, and if we hang onto an explanation, we’re just trying to re-create the past.”

- “I came away from the last session feeling wonderful and truly connected for the first time! I can now see where I tend to get stuck. It was a relief for the mind that has been troubling me on the path for so long.”

- “My thanks to Gabor for this course! Since I interacted with Gabor for the first time, I have consistently had the confident feeling that he is truly anchored in the reality pointed to in the past by spiritual luminaries such as Ramana Maharshi and by founders of religions such as Buddha and Jesus. Having the opportunity to interact with Gabor closely is a blessing. Gabor's unassuming, friendly and generous attitude toward us as he guides everybody along the (apparent) spiritual path that we are treading is very reassuring.”

- “Much appreciated is the loving sincerity of these sessions and I’ve experienced a deepening and a flow that I’ve never experienced before.  A trust has continued to develop and expand with you, Gabor, and the teaching that brings a new level of understanding.  Gabor has the ability to cut through the fog to the essence of simplicity. I have received many amazing insights during this course and when I got momentary optimum – it was a huge opening and freedom and seemed to bypass the concepts."

- “Although I only encountered you on 3rd February (not a lot of linear time) there is a feeling of connection that goes well beyond anything that words can describe. I am continuing with integrating your pointers and practices. Also included in my practice is the watching of your videos & previous classes as each momentary optimum is always new and I hear things in a completely new way.”